Mid-February Updates

  • Writer: Keahn Divecha
    Keahn Divecha
  • Feb 11, 2023
  • 1 min read

The ME team redesigned the legs for the drone and began manufacturing the new design. Manufacturing took a few days but was completed with minimal hiccups. By end of the week, the drone had the legs and landing gear assembled.


The SW team could not move further with the CV design until the target adapter was designed and manufactured however the team did work with the ME team to design the adapter to ensure the adapter would be identifiable by the CV algorithm. Once the new radio controller arrived the SW worked to interface the controller with the FC and completed the initial configuration of the radio controller. Tests were conducted to ensure the communication between the controller and the FC was reliable.

 
 
 

Recent Posts

See All
Early March Updates

Flight test 2, once the new propellers arrived the team began another flight test. This flight test was conducted using the radio...

 
 
 
February Game Plan

After ordering new propellers, there has been some lead time where flight testing cannot be done. So in the meantime, we ordered a manual...

 
 
 
End of February Updates

The design for the egg was completed and manufacturing began. Most components were to be 3D printed and each component would take several...

 
 
 

Comments


bottom of page